Pole Substation & Street Lighting
Kangy Angy Intercity Fleet Maintenance Facility
Level 1 ASP Projects
Client
John Holland Constructions
Value
$800,000
Scope
</div>Relocate Ausgrid assets and install up to 150 private streetlights for rail sidings</div>
Project Highlights
- Installation of a new main switchboard to power the private lighting fed from Ausgrid network.
- Relocation of overhead High Voltage power poles and an overhead conductor which was no longer required.
- Work was conducted over several stages to accommodate heavy traffic conditions and John Holland’s critical milestones.